Basic Information
Project Overview:
Time:2011
Location:Dakar
Type:warehouse
Area:3000㎡

Key Challenges:
1. Construction of office site facilities on a remote dry desert location.
2. Extreme weather conditions on this remote dry and high temperature desert location tested the quality and durability of our prefab houses and facilities.
3. Low budget of this project means we need to try our best to decline the cost meanwhile insure the quality of the products.

Solution:
1.According to the local weather, we suggested using fire-proof sandwich panel which we called rock wool panel for wall and roof.
2.For lower price, we use k house style whose steel structures are C section steel, pre-made in factory. Only use bolts and screw nuts to fix the connection plate an workers install the house, the steel structure expose outside. This can cut the cost and time of installation.
Feature:
1.Easy installed and disassembled
2.Green and Eco-friendly 100% recyclable materials
3.Light steel structure
4.Strong fire proof, heat resistance
5.Factory competitive price

Details:
Steel: C section steel
Roof:50mm rock wool sandwich panel
Wall:50mm rock wool sandwich panel
Door: Steel door
Window:Aluminium alloy sliding window